banner

Customized Aluminum Die-casting Automotive Parts, in House Short Time Molding, CNC Machined

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-27 15:22

  • Browse the number:

    96

Send an inquiries
Company Profile
Hangzhou Guardson Hardware Co. Ltd
By certification [File Integrity]
Contact:

formal(Mr.)  

Telephone:

(86 571) 88211777 Ext:211 (86 571) 88211666

Area:

Beijing

Address:

Rm 302, Design Commercial Building, Gongshu District, Hangzhou, Zhejiang, China (310005)

Website: http://formal.nkmsx.com/
Product details
Model Number: LF-46388 Brand Name: LF Key Specifications/Special Features: Specification:OEM/ODM aluminum die-cast ATV, motorcycle parts, gasoline engine housing, gasoline engine block, other motorcycle, ATVpartsMaterial: aluminum or other alloyProcess: die-casting and finishingCustomized drawings are welcome
  • Ability:
    • Materials: gray iron, ductile iron, steel, stainless steel, brass, copper, bronze, aluminum, zinc and more
    • Process: sandcasting, precision casting, lost wax casting, die-casting, forging, stamping, machining and more
    • Machine lathe, CNC, drilling machine, milling machine, boring machine, planting machine, machining center
    • Tolerance casting: 0.5mm
    • Machining: 0.05mm
    • Finish machining: 0.005mm
    • Capacity:
      • Maximum diameter: 1m
      • Maximum weight: 200kg
    • Surface treatment: powder coating, painting, spraying, galvanization
  • OEM and customized services:
    • Quality guarantee
    • Chemical checking
    • NDE after rough machining
    • Mechanical testing after heat treatment
    • Final NDE, dimensions are inspected
  • Quality document: full QA document as per customer's requirements
  • Standard export packaging: carton/wooden case/pallet
  • Shipping Information:
    • FOB Port: Shenzhen
    • Lead Time: 15 - 30 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe
    New Products